[ad_1]
Ranchi, Union Road Transport and Highways Minister Nitin Gadkari (Nitin Gadkari) claims that the highway frame of India (India) will reach America (America) by 2024. He said that for this work is being done in a mission mode in a time-bound manner and construction of green expressway and rail over bridge is also being done.
Gadkari told PTI in an interview that ‘Bharatmala-2’ would soon get cabinet nod. This completes the beauty of a beautiful glimpse into the country once it meets the beach.
Gadkari said, “I am confident that India’s highway framework will be like America’s by 2024. For this, work is being done in the form of a mission. Along with this, green expressway network is also being constructed. The Road Transport and Highways Minister informed that rail overbridges are being constructed this year at a cost of Rs 16,000 crore, which will be increased to Rs 50,000 crore in five years.
On the Kailash Mansarovar Highway project via Pithoragarh, Gadkari said, “93 per cent work has been completed on the Kailash Mansarovar project.” Difficult travel would result in savings and also a reduction in travel time by several days. At present, it takes two-three weeks to travel to Kailash Mansarovar through Sikkim or Nepal route. On Bharatmala Phase-II, the Minister said, “There is a possibility of meeting soon for Bharatmala Phase-II. With this, the construction of highways will be faster. Initially, about 5,000 km of highway network is envisaged under the second phase.
The Bharatmala Pariyojana is the largest infrastructure program in the country to develop about 35,000 km of national highway corridors connecting over 580 networks. Gadkari said, “The work of seven new expressways, economic charts and inter charts is being done in Jharkhand at a cost of Rs 70,000 crore.
Apart from this, work worth Rs 50,000 crore is being done for better connectivity with states like Odisha, Chhattisgarh, West Bengal, Bihar and Uttar Pradesh, he said. Giving details of the project, the minister said that work on a four-laning of the Ranchi-Varanasi inter-project is being done at a cost of Rs 6,200 crore. This will result in substantial reduction in travel time between Ranchi and Varanasi.
Similarly, the 635-km Raipur-Dhanbad economic corridor is being constructed at a cost of Rs 15,000 crore. Once this corrugation is made, this way, the spots and working sheets will be ensured faster. He informed that in another project, the 620 kilometer Access Expressed Green Expressway is being constructed at a cost of Rs 22,000 crore. Similarly, 230 km Ranchi-Sambalpur will spend Rs 6,300 crore on economic possibilities.
!function(f,b,e,v,n,t,s)
{if(f.fbq)return;n=f.fbq=function(){n.callMethod?
n.callMethod.apply(n,arguments):n.queue.push(arguments)};
if(!f._fbq)f._fbq=n;n.push=n;n.loaded=!0;n.version=’2.0′;
n.queue=[];t=b.createElement(e);t.async=!0;
t.src=v;s=b.getElementsByTagName(e)[0];
s.parentNode.insertBefore(t,s)}(window, document,’script’,
‘https://connect.facebook.net/en_US/fbevents.js’);
fbq(‘init’, ‘2638761196163484’);
fbq(‘track’, ‘PageView’);
[ad_2]
Source link